OVERVIEW
Solar resource, layout, energy-yield, losses, DC/AC ratio, inverter selection, and project assumptions reviewed for bankable PV performance.
PV design decisions
- What PV capacity and layout can the site realistically host?
- Which losses, shading, clipping, or grid constraints affect yield?
- Are the yield assumptions strong enough for EPC, PPA, or investment review?
Yield outputs
- Preliminary PV layout and capacity basis
- Yield estimate with losses and performance assumptions
- DC/AC ratio, inverter, and export-limit notes
- Bankability risks and next-stage design requirements
Solar inputs
- Site boundaries, roof/land area, and shading information
- Weather/irradiance source and design constraints
- Module, inverter, mounting, and grid-connection assumptions
- Tariff, PPA, or energy-use objective