OVERVIEW
Integrated solar-storage systems for cost reduction, reliability improvement, and better grid interaction.
PV+BESS decisions
- How should PV and BESS be sized together rather than separately?
- Should storage prioritise backup, peak shaving, export control, or solar shifting?
- What inverter, EMS, and grid-interface assumptions are needed?
Hybrid asset outputs
- PV+BESS sizing and dispatch logic
- SOC, export-limit, and curtailment assumptions
- EMS/control and interconnection notes
- Technical basis for EPC or investment review
Solar-storage inputs
- PV resource and load/generation profile
- Grid export/import limit and tariff rules
- Backup requirement or revenue/use-case priority
- Inverter, EMS, and site integration constraints