OVERVIEW
Connection studies, substation interfaces, metering points, protection, and grid-code readiness.
Interconnection decisions
- Where should the project connect and at what voltage level?
- What metering, protection, transformer, switchgear, or communication interfaces are required?
- What evidence is needed for utility approval before procurement or construction?
Interconnection outputs
- Point-of-interconnection options and recommendation
- Grid-interface and single-line assumptions
- Metering, protection, and grid-code readiness notes
- Utility application/supporting technical inputs
Utility-interface inputs
- Project capacity, technology type, and export/import profile
- Proposed POI, voltage level, feeder/substation data
- Utility application forms and grid-code requirements
- Single-line diagrams and equipment/interface assumptions