OVERVIEW
Review of voltage, frequency, reactive power, fault ride-through, protection, telemetry, and operating requirements for utility interconnection.
Compliance decisions
- Which grid-code requirements apply to the plant and POI?
- Can the selected equipment meet voltage, frequency, reactive power, and ride-through rules?
- What evidence is needed before utility approval or commissioning?
Grid-code outputs
- Grid-code requirement matrix
- Plant capability and compliance gap note
- PPC, metering, telemetry, and protection assumptions
- Submission-ready compliance evidence checklist