OVERVIEW
Solar-assisted charging hubs with BESS, grid connection, and demand-management planning.
Charging hub decisions
- What charger mix and power level match the target users and dwell time?
- Is the local grid sufficient, or is solar+BESS support needed?
- What commercial model fits the site: public hub, depot, fleet service, or charging-as-a-service?
EV hub outputs
- Charging demand and load estimate
- Charger sizing, phasing, and site energy concept
- Grid impact, safety, and operation-readiness notes
- Business model and expansion pathway
Charging-site inputs
- Vehicle types, user groups, dwell time, and charging schedule
- Available grid capacity, transformer size, and site layout
- Tariff, demand-charge, and payment assumptions
- Future expansion and reliability requirements