OVERVIEW
MV/HV interface, transformers, switchgear, cabling, protection, metering, earthing, and plant electrical architecture for solar and storage projects.
BoP design decisions
- What MV/HV architecture best fits the plant capacity and POI?
- Which switchgear, transformer, metering, and protection interfaces are required?
- What electrical scope must be clarified before EPC tender or procurement?
Electrical outputs
- Electrical architecture and single-line basis
- Transformer, switchgear, metering, and cable assumptions
- Protection, earthing, and auxiliary-supply notes
- EPC-ready electrical scope and interface checklist