OVERVIEW
Feeder support, voltage management, hosting capacity improvement, and reliability upgrade concepts.
Distribution upgrade decisions
- Which feeder, transformer, or voltage constraint limits service quality or DER connection?
- What upgrade provides the best reliability and capacity improvement per cost?
- How should upgrades be phased with demand growth or new connections?
Network upgrade outputs
- Feeder constraint and upgrade-options note
- Voltage, loading, and reliability improvement assumptions
- Preliminary scope for distribution reinforcement
- Prioritised upgrade pathway
Feeder inputs
- Feeder loading, voltage, outage, and transformer data
- Load growth and new-connection forecasts
- Existing network drawings and protection settings
- Utility standards, budget, and implementation constraints
Related distribution work