OVERVIEW
Independent technical review of design assumptions, studies, drawings, equipment choices, EPC scope, and project risks before major commitments.
Owner's decisions
- Are the design assumptions technically sound and complete?
- What risks should be corrected before EPC award, procurement, or construction?
- Which interfaces need owner clarification before commitments are made?
Review outputs
- Independent design-review comments
- Risk and gap register
- EPC scope and interface review notes
- Action list for owner, EPC, or consultant follow-up
Project inputs
- Drawings, specifications, studies, and EPC scope
- Equipment datasheets and design assumptions
- Project schedule, budget, and procurement status
- Owner requirements and acceptance criteria