Commissioning Support

OVERVIEW

Commissioning plans, test procedures, acceptance checks, performance verification, and documentation support for power assets.

     


Commissioning decisions

  • What tests prove the asset is safe, functional, and ready for operation?
  • Which acceptance criteria must be met before handover?
  • What documentation is needed for owner, utility, and operator sign-off?

Commissioning outputs

  • Commissioning plan and test-procedure checklist
  • Functional test and acceptance evidence review
  • Punch-list and readiness-tracking notes
  • Handover documentation and close-out requirements

Handover inputs

  • Commissioning plan, test sheets, and EPC scope
  • Protection, SCADA, metering, and equipment documentation
  • Utility acceptance requirements and grid-code tests
  • O&M manuals, as-built drawings, and punch-list records