Battery power and energy sizing based on peak shaving, backup, curtailment recovery, dispatch strategy, cycling, degradation, and lifecycle replacement needs.
Storage sizing decisions
What MW/MWh size matches the technical and commercial use case?
How should the BESS dispatch across normal, constrained, and outage conditions?
How do degradation, safety, warranty, and replacement affect the project case?
BESS outputs
BESS MW/MWh sizing options
SOC, cycle, dispatch, and degradation assumptions
Use-case value and operating-mode summary
Lifecycle replacement, safety, and site-readiness notes